& Construction

Integrated BIM tools, including Revit, AutoCAD, and Civil 3D
& Manufacturing

Professional CAD/CAM tools built on Inventor and AutoCAD
To tackle low productivity, high energy consumption, disconnected collaboration, and the difficult construction of hyperbolic curtain walls, the Jinan Aoti East Plot 12 and 16 super-tall tower uses a BIM-based B2M digital intelligence system to modernize traditional construction.
Integrated with AI-powered parametric optimization, 3D laser scanning, cross-platform data interoperability, and real-time digital twin monitoring, the system creates a full-process digital chain spanning design, prefabrication, and on-site installation.
Using this method, curtain-wall fabrication drops from 11 steps to six, increasing efficiency by more than 300% and removing manual errors. The approach reduces hyperbolic components by 90%, cuts carbon emissions by 56 tons, achieves centimeter-level precision, and enables paperless smart management. The project is saving RMB 1.85 million ($275,246) while establishing a new benchmark for green, intelligent construction.