Customer challenge

Polish company Metgór deals with the manufacturing of steel elements based on technical documentation for the mining industry. They services include repairs and overhauls of subassemblies and devices used in diesel transport equipment.

Metgór implements projects that require meeting specific conditions, related to the underground mining industry. The nature of the services provided requires an efficient analysis of the contractor's needs and improving of design, technology and manufacturing process.


Project goals

The previous tools and methods  of designing and manufacturing did not allow for shortening the whole process - from analysis, offers preparation through the CAD - CAM design to the final product. Metgór was looking for for a solution of a complete CAD/CAM system that could be purchased as a subscription and would allow extending its functionality in the future.






Solution

The implementation of Autodesk Fusion 360 – CAD/CAM cloud solution enables us an efficient and easy preparation of technical documentation. Fusion 360 allows us to download the designed model to the CAM technological module easily and then transfer it to our Turning Center.

We currently use two subscriptions of Fusion 360. Meeting the requirements of contractors we are considering further development of our CNC Center, that will allow us to extend the functionality of Fusion 360 with Machining Simulation Extension.

Business outcome

The Fusion 360 allowed METGÓR to speed up the production process and optimize costs in comparison to their previously used CAD/CAM system.



Conclusion

The Fusion cloud access to data enabled us to make faster decisions throughout the production process. Support in the implementation of Fusion 360 was provided by CADVISION – PA NOVA Group. Thanks to cooperation with the supplier, we were able to quickly train our designers, technologists and operators of CNC machines.

Project summary

    Duration & delivery

  • 10
  • 2022-07-18

    Autodesk solutions

  • Fusion 360
  • Fusion 360 - Simulation Extension

    Services provided

  • Post Processor
  • Installation
  • Training

    Customer industry

  • Additive Manufacturing
  • Design
  • Subtractive Manufacturing
More success stories

NEWAG S.A. Implemented the Product Design & Manufacturing Collection and Fusion 360 Manage

NEWAG S.A. is a leading Polish manufacturer of electric and diesel passenger vehicles, electric and diesel locomotives and subway and tramway vehicles. The entire process of creating and designing a rail vehicle is done digitally, which ensures full control over the quality and availability of materials.


View

Human Resource Management at NEWAG IP

NEWAG IP Management sp. z o. o. was created within the NEWAG Capital Group as a company dedicated to managing intellectual property rights - know-how and trademarks. The NEWAG S. A. Capital Group has dominated the domestic market for production of electric multiple units, production and modernization of electric locomotives and modernization of diesel locomotives. Maintaining such a position in the market requires a group of 150 engineers working on several projects simultaneously.


Optimize Design Processes and Increase the Efficiency of Cross-Industry Cooperation with the Autodesk Architecture, Engineering and Construction Collection

PANOVA STUDIO treats every project as a new challenge. The design process is complex and interdependent on many factors. Therefore, when embarking on the Eco City Katowice project, the office had to anticipate and plan the entire design process. They knew from the beginning that they wanted to use the capabilities of the Architecture, Engineering & Construction Collection software to complete such a project. The company wanted to develop a method of cooperation that would streamline the design process at the stage of construction design, detailed design and coordination of progress on site. The first stage of work, which included an analysis of the plot's potential, was very important for the whole project. Among other things, at this stage of work, drone flights were made on the basis of which a numerical model of the terrain was created using Civil 3D software. The file transferred to Autodesk Revit allowed the conceptual work to begin with a complete set of key information.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.