Back to Profile

Contact partner

Success Story

How SMARTBOX INDUSTRIES Managed Their Digital Transformation Journey Efficiently with Autodesk Solutions

How SMARTBOX INDUSTRIES Managed Their Digital Transformation Journey Efficiently with Autodesk Solutions

Customer challenge

PROJECT NAME: Dubai Police Innovation Hub – Dubai Police HQ, Dubai, UAE.

Project comprises of Hybrid structures using shipping containers and steel structures.

The space is developed as an Innovation Hub for the Dubai Police HQ.


Construction Type: Complex

Area size: 200 sqm

No. of Container: 8x40'HC

Solution Type: Office

Scope of Work: Design and Turnkey


Why did the client choose containers?

Shipping containers was an exciting choice to suit the client's innovation space concept and the execution timelines. Also, it was a large-scale prestigious project with high-visibility.







Project goals

The project has consecutive phases. During the initial phase, the teams did not use a BIM collaboration platform. In the past, we used to store the BIM model on our server and export it whenever we needed to share it with clients. 

"We would send the model through WeTransfer and wouldn’t know when it is used. The partner would take one or two weeks to get back to us, and by that time, the model might already be outdated,” explained Ananth Jaison – IT Manager at SMARTBOX. 

“Customers would often write their comments on the printout and would need to be transferred to Revit. Sometimes there is the chance of misunderstanding which will lead to error. We want to win high value projects with in-house expertise to compete for more BIM projects which will increase profits and have full control on their projects."


Solution

Smart Box Industries needed to implement BIM software and shift from an AutoCAD setup to an industry-specific Autodesk Architecture, Engineering & Construction (AEC) Collection solution. Moreover, collaboration of design, project and procurement teams are required for any project which can be controlled and streamlined using the BIM Collaborate Pro solution.


Smart Box Industries realized that a digital transformation yields major business benefits, like improved client satisfaction and design quality, risk reduction, reduced errors and rework, and meaningful sustainability and operational efficiency benefits.





Business outcome

The project is led by Smart Box Industries who is the pioneer of modular construction with shipping containers in the region. Based in Dubai, UAE, we have served our clients for over 25 years to Design, Manufacture, Transport and Install, Temporary or Permanent architectural projects worldwide. Our experienced team delivers high-quality, rapid construction solutions across various industries.


One of the most-cited benefits of BIM is the collaboration opportunities through a common data environment (CDE) and taking advantage of the cloud. A large majority of BIM users use a Common Data Environment (CDE) to exchange data with their project teams. And Smart Box is reporting the greatest value from its use.

Conclusion

CAD GULF LLC and Autodesk Solutions helped Smart Box Industries to improve productivity, reduce rework and accelerate our project delivery. Smart Box Industries was able to further educate and grow the capabilities of the design team. Team performance has been improved as a result of Digital transformation journey.

"SMARTBOX Industries mandates to use BIM Collaborate Pro and the AEC Collection on all upcoming new projects.”


Project summary

    Duration & delivery

  • 600
  • 2021-04-29

    Autodesk solutions

  • Architecture, Engineering & Construction Collection
  • BIM Collaborate
  • Revit

    Services provided

  • BIM
  • API/Script Support
  • BIM/CAD Standards
  • Forge
  • Migration, Data Loading & Interoperability
  • 3D Modeling
  • Concept Development
  • Design/Sales Automation
  • Plotting
  • Prototyping
  • Training
  • Animation
  • Augmented Reality (AR)
  • Rendering
  • Virtual Reality (VR)

    Customer industry

  • Architecture
  • Civil Engineering
  • Construction
  • Facility Management
  • MEP Engineering
  • Mining & Quarrying
  • Oil & Gas
  • Other Engineering Industries
  • Structural Engineering
  • Utilities & Telecommunications
  • Water & Wastewater
More success stories

CAD to BIM Transformation Journey

ZAD Studio, a Design Studio who creates and builds exceptional environments and specializes in the integration of Architecture, Interiors and Landscapes, required a collection of solutions which would enable the design team to deliver a range of services across architecture, master planning, urban design, and sustainable design. Their team of designers were spending a lot of time on rework and managing data. In addition to that, they had challenges in onsite and real-time coordination.


View

Implementation of Premium Subscription in Dubai Municipality

Dubai Municipality (DM) has many divisions like Building Permit, Heritage, Projects and Environmental departments where they deploy Autodesk solutions. The IT team had been facing challenges on providing access to the users as and when the demand emerged. The user tracking and the product usage were the two main parameters they were missing with the existing multi-user access. The need for critical support also increased at non-business hours due to the new normal of work experience.


How Brewer Smith Brewer Group (BSBG) Created High-Quality Architecture and Engineering Designs with BIM Collaborate Pro & AEC Tools

PROJECT NAME:  ICD Brookfield Place (Iconic and elegant, a premium business address in the heart of Dubai’s financial district).ICD Brookfield Place is a 53-story commercial office tower elegantly positioned alongside an expansive mixed-use podium structure, located in the heart of Dubai International Financial Centre (DIFC). Brewer Smith Brewer Group (BSBG) is providing lead consultancy and executive architecture services in delivering this highly complex development.The tower takes the form of a sharp prismatic structure, orientated off-grid to capture environmental benefits. The minimalist elegance of the glass façade and subtle faceted skin changes appearance throughout the day as the sun moves across the sky.Featuring a highly complex steel frame structure and one of the world’s largest basements with seven levels, ICD Brookfield Place required a sophisticated level of technical coordination to ensure alignment between consultants, contractors and the authorities.Pre-existing conditions on site meant a number of large piles and foundations remained from a previous development, some of which were utilised for the project. This in itself is an intricate process that demands specialist task management and a precise attention to design detail.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.