Back to Profile

Contact partner

Success Story

CAD to BIM Transformation Journey

CAD to BIM Transformation Journey

Customer challenge

ZAD Studio, a Design Studio who creates and builds exceptional environments and specializes in the integration of Architecture, Interiors and Landscapes, required a collection of solutions which would enable the design team to deliver a range of services across architecture, master planning, urban design, and sustainable design. Their team of designers were spending a lot of time on rework and managing data. In addition to that, they had challenges in onsite and real-time coordination.

Project goals

The majority of the AEC industry is still dependent on the ancient old-style approach of 2D plans and hesitant to adapt to the new practices. Team CAD Gulf understood that ZAD Studio required a solution that would assist them in mitigating project risk and help them deliver buildings on time and within budget. The top priority was to reduce time spent on rework and coordination.

Solution

As an Autodesk Gold Partner, CAD Gulf identified that transforming to a BIM workflow was the right solution for ZAD Studio in order to save a great deal of time and cost. The solution included setting up a BIM-based workflow, providing a software package to all the users, and getting them trained in all related areas.

Business outcome

The ZAD Studios design process has been improved and streamlined with the implementation of a BIM workflow. Key business outcomes included the following: 1) Better quality of designs 2) Multiple tools in the AEC workflow helped them analyse the environmental performance and lifecycle cost 3) Design team could now perform simulations effectively and quickly 4) Designs could better convey to clients using visualizations 5) Cost of rework has significantly reduced with the new BIM-based workflow

Conclusion

CAD Gulf and the Autodesk Architecture, Engineering & Construction (AEC) Collection helped ZAD Studio improve their productivity, reduce rework, and accelerate their project delivery. The team performance has been improved as a result of the transformation journey.

Project summary

    Duration & delivery

  • 60
  • 2020-07-30

    Autodesk solutions

  • Architecture
  • Engineering & Construction Collection
  • Revit
  • 3ds Max

    Services provided

  • Business Transformation Services
  • Technical Support
  • Product Training

    Customer industry

  • Architecture, Engineering & Construction
More success stories

Implementation of Premium Subscription in Dubai Municipality

Dubai Municipality (DM) has many divisions like Building Permit, Heritage, Projects and Environmental departments where they deploy Autodesk solutions. The IT team had been facing challenges on providing access to the users as and when the demand emerged. The user tracking and the product usage were the two main parameters they were missing with the existing multi-user access. The need for critical support also increased at non-business hours due to the new normal of work experience.


View

How Brewer Smith Brewer Group (BSBG) Created High-Quality Architecture and Engineering Designs with BIM Collaborate Pro & AEC Tools

PROJECT NAME:  ICD Brookfield Place (Iconic and elegant, a premium business address in the heart of Dubai’s financial district).ICD Brookfield Place is a 53-story commercial office tower elegantly positioned alongside an expansive mixed-use podium structure, located in the heart of Dubai International Financial Centre (DIFC). Brewer Smith Brewer Group (BSBG) is providing lead consultancy and executive architecture services in delivering this highly complex development.The tower takes the form of a sharp prismatic structure, orientated off-grid to capture environmental benefits. The minimalist elegance of the glass façade and subtle faceted skin changes appearance throughout the day as the sun moves across the sky.Featuring a highly complex steel frame structure and one of the world’s largest basements with seven levels, ICD Brookfield Place required a sophisticated level of technical coordination to ensure alignment between consultants, contractors and the authorities.Pre-existing conditions on site meant a number of large piles and foundations remained from a previous development, some of which were utilised for the project. This in itself is an intricate process that demands specialist task management and a precise attention to design detail.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.