Customer challenge

Palm Hills Developments became an ever-growing leader in integrated residential, commercial and resorts projects since 1997. Today, they possess one of the largest and most diversified land banks spreading 29 million square meters, and an impressive roster of 34 projects in West Cairo, East Cairo, Alexandria and North Coast. Recently they are working on one of their largest projects in Egypt which is Badya city and their team faced the following challenges: 

  • Around 12 parties of project Contractors, Consultants and Project management Company are required to collaborate on the same project delivery with clear requirement to high level of coordination and visibility of information with some level of confidentiality at the same time. 
  • Releasing shop drawings, raising RFI and resolving the issues at the same time was a major task as the construction and installation started on the site , submitted by 9 Contractors to Julius Berger international (JBI) to seek approval and manage Construction phases on site. 
  • Frequent Construction Reports regarding safety and quality with significant impact on the execution process on site.

Project goals

After evaluating the demands and needs of Palm hills Development for such project, the Autodesk Construction Cloud product family was introduced. Various presentations were delivered and sample field studies have been done. As the result of several meetings, we analyzed that they needed a single platform to manage all processes and stakeholders during the site construction phase. During workflows in field operations, they decided to use Autodesk Docs and build. Their goal was to establish connected data exchange between approved Documents and processes in construction.

Solution

TEA Computers presented and explained the below topics: 

  • Access of field teams to current data from common data environment.
  • Definition of roles of project partners through the workflows.
  • Preparation of quality and non-conformance report forms (NCR, QA forms).
  • Use of mobile application in the field.

Business outcome

Palm hills Developments as the owner of the project and the other parties in Badya project leaded by the owner representative (JBI-Julius Berger international) all of them have experienced the use of Autodesk Cloud products in the field and sharing information with the Project teams. They learned how to easily create quality, safety, or even to seek shop drawings approval through documents Reviews workflows.

Conclusion

In conclusion, with a mobile application fast and accurate, solutions can be provided and the Autodesk Construction Cloud is an efficient platform for field works.

Project summary

    Duration & delivery

  • 120
  • 2023-12-01

    Autodesk solutions

  • BIM 360 Build
  • Build
  • Docs

    Services provided

  • BIM
  • API/Script Support
  • BIM/CAD Standards
  • Forge
  • Migration, Data Loading & Interoperability
  • AEC
  • Installation
  • Configuration & Deployment
  • Updates & Upgrades

    Customer industry

  • Architecture
  • Civil Engineering
  • Construction Design
  • Facility Management
  • MEP Engineering
  • Mining & Quarrying
  • Oil & Gas
  • Other Engineering Industries
  • Structural Engineering
  • Utilities & Telecommunications
  • Water & Wastewater
More success stories

EL ALAMEIN NEW CITY - RETAIL AND ETERTAINMENT ZONE

Hassan Allam Contracting (HAC) identified the following business challenges: 1) Get the Technical Team trained and oriented to use BIM technology and Autodesk products properly 2) Meet project deadlines with better deliverables 3) Develop engineering performance and services provided to the operations department 4) Comply with market needs


View

SCENARIO NEW CAPITAL

Akam Development identified the following business challenges: 1) Integrating Autodesk solutions effectively 2) Utilizing the power of the cloud in time 3) Reducing costs


Amaad Business Park

Al Kifah Contracting Corporation identified the following business challenges requiring expert help: 1) Complicated systems and too much coordination required 2) Logistics is considered a major challenge as the project site was tight and needed manipulation 3) Many transformations in underground utilities 4) Reduced time for sheet production due to a lot of modifications and coordination 5) Precast works was critical due to its high cost


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.