Customer challenge

The challenge for the customer was the need to re-typing the same data into multiple data sources. This resulted in time spent on non-value-adding work and a high risk of errors. The customer had to manually retype the same project data into multiple data sources. The impact of this was waste of time and a source for typing errors. They also had to manually update the general document management system manually when data was released in Autodesk Vault.

Project goals

The goal was to integrate the main data sources to minimize the waste of non-value-added work and minimize the risk of typing errors. The expected business outcome was to use the resources to work with more value-added tasks. This would help ITK to be more competitive.

Solution

The solution is based on Autodesk Vault Professional APIs and customizations made from Cadcraft. ITKs project management system Blikk and Vault is integrated to automatically transfer project data from Blikk into Autodesk Vault. Autodesk Vault is also connected to ITKs document management system, M-Files, for non CAD files. When technical data is released in Autodesk Vault, secondary documents are automatically published to M-Files together with corresponding metadata.

Business outcome

With the solution in place ITK can focus on work that gives value to their customers. They have saved both time and minimized error by the integration between their main business critical systems. This has helped ITK with 600 h saved and free up to be used on value-adding work. Also, it is super easy to find the right data

Conclusion

With Cadcraft's knowledge and engagement from the customer ITK, we have together developed a smart solution. With relatively little effort, we have succeeded in achieving large profits. Digitization does not need to be large complex projects to give good results.

Project summary

    Duration & delivery

  • 8
  • 2020-12-14

    Autodesk solutions

  • Vault Professional

    Services provided

  • System Integration

    Customer industry

  • Design & Manufacturing
More success stories

System Integration: Vault with Monitor ERP

Cflow is expanding and they faced a couple of different challenges preventing them to grow in a good way. With huge lack of Item and BOM control and no connection between PDM (Vault) and ERP systems, the time waste was high. A lot of manual actions were required and the need to create the same information many times often occurred. Low reuse of parts led to an "everything is custom" mentality which is very inefficient for the company.


View

Connected Quality Processes with Fusion 360 Manage

Lindab suffered from old disconnected IT systems within Quailty. This led to difficulties regarding tracking and responding to claims. To have a broken digital chain of information gave a lot of waste, both time-wise & money-wise. Having the right visual KPIs was a challenge for Lindab. Not being able to track and understand the root cause was also a problem. The situation of not having the right data at the hand can lead to wrong decisions.


Intrx gained increased quality in their project management with Fusion 360 Manage

Intrx wanted to increase the quality in their project management and also offer a better solution for supplier collaboration. Early in the projects they wanted to see where more resources where needed to be able to reach the goals of the project. They also wanted to have a modern solution and platform for all the processes and to be able to adapt to future demands.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.