Customer challenge

ICE Industrial Services develops, designs, programs and installs automated machines and lines for major companies around the world. Teamwork and data sharing within a company are essential to the operation of most modern businesses. This is also the case at ICE Industrial Services, a. s. - one of the fastest growing automation companies in the Czech Republic and probably in Europe. For this company, our company ADEON has implemented the Autodesk Vault Workgroup system exactly to measure. Thanks to this, we managed to maximally increase work efficiency, eliminate the risk of knowledge loss and centralize design data.

Project goals

A major milestone in the company's history is the decision to start with the more advanced Autodesk Vault (Workgroup/Professional) program. It's the start of a journey to greater productivity, guaranteed file order and lots of time saved. At the very beginning, the company always receives a detailed proposal (rough analysis) including ROI and it is up to the company to decide whether to go down the upgrade path. This is followed by a detailed analysis of the company's processes or a few sessions with selected people in the company who will work with the design data. Once we have accurately analyzed your needs, we can start programming Vault add-ons to help automate routine activities. At the same time, server configuration and installation begins. As soon as possible, a test run is started to fine-tune the process flows.

Solution

As soon as ICE management approved the deployment of Vault Workgroup, ADEON began conducting a detailed analysis of the company's processes. At the same time as Vault was being deployed, the ERP system was being deployed. Which proved to be an advantage as we were able to work closely with their implementation team, aligning the look and feel of both systems. We were also interested in all the movement of design data in the company. Following on from this, interviews were conducted with department managers to find out how their work with data was going. Consultation with each department head is a necessity to ensure that Vault properly secures the final distribution of documents and design information.

Business outcome

ADEON has added programming modifications to its own functionality of Autodesk Vault. Their goal was to make the work of users easier and more efficient, eliminating activities that can be automated. The result is optimized information communication between Inventor, Vault and the ERP system. An essential part of these program modifications is the building of control mechanisms that will protect data from non-standard work procedures. From the whole analysis, the most necessary thing is to correctly define the key requirements for the future system, which in our case were: 1) to create a central managed repository 2) synchronisation of design data 3) introduce controlled revisions 4) connection to the information system 5) automation of routine work

Conclusion

The first step in the implementation process is to install Vault on the company's server and customize the software to the exact requirements. Different user groups are set up, the documentation, its lifecycles and other requirements resulting from the previous analysis are categorized and classified. A very important step is the gradual testing and commissioning of the programmed applications and services, testing and fine-tuning their functionality. The better the quality of the testing phase, the smoother it is for the company to go live. Even so, minor problems may only become apparent after several months of routine operation. In every company, changes in company processes occur over time. That is why our implementers provide long-term support for the implemented solution.

Project summary

    Duration & delivery

  • 30
  • 2020-11-30

    Autodesk solutions

  • Vault Workgroup
  • Inventor
  • Product Design & Manufacturing Collection

    Services provided

  • Product Training
  • System Implementation
  • Configuration & Deployment
  • Technical Support
  • Product Activation & Onboarding
  • System Integration
  • System & Software Maintenance
  • Workflow Documentation
  • Data Migration
  • Custom Application Development

    Customer industry

  • Design & Manufacturing
More success stories

Implementation of Data Management System in PSP Engineering a.s. (czech)

PSP Engineering a.s. provides complex engineering for the mechanical, electrical and structural parts of machines and complete plants for the building materials industry. For more than 50 years, PSP Engineering has been associated with the design and technology for cement plants, crushing and screening plants for quarry stone, gravel and sand, lime plants and coal and ore processing plants. The PDM system for data management allows working in a team of people, where they do not overwrite each other's files and very quickly find the necessary data in the entire database, records file versions and allows efficient copying of data. This program runs on a server (even virtually) and depending on the version of this program you choose, Autodesk Vault is divided into Vault Basic (free with Inventor) and the more advanced Workgroup and Professional. In addition to these versions, Vault Office, primarily for everyone except engineers, is also used.


View

How Navisworks Helps in BIM Projects at HUTNÍ PROJEKT Frýdek-Místek (czech)

HUTNÍ PROJEKT Frýdek-Místek is a private engineering and contracting company with a strong design background, established in the 1950's and today one of the leading Czech engineering and contracting organizations. Our company influences the level of the Czech and world coke industry and heavy metallurgical chemistry. HUTNÍ PROJEKT Frýdek-Místek a.s. was awarded a contract for the documentation of the coke oven gas cooling system for the Dutch coke plant TATA Steel in IJmujden. The IJmuiden production plant of Tata Steel (Netherlands) produces about 7.2 million tonnes of liquid steel annually in two blast furnaces and one basic oxygen steel plant. A total of 2 million tonnes of coke is produced annually for the blast furnace operation in two coke ovens and gas-fired power plants. In addition, the coke oven gas produced is used as an energy source in other installations at the IJmuiden site.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.