Customer challenge

SWECO is one of Europe’s leading architecture and engineering consultancies, carrying out multidisciplinary projects in 70 countries annually across the world. It has a substantial presence in the Netherlands, delivering major projects for the public and private sector. The technical leadership within the Netherlands division identified BIM as a catalyst for growth and standardisation as well as the opportunity to provide new services to a broader range of customers. The team were already highly proficient at using Autodesk’s BIM technology to deliver customer projects but identified a need to adopt industry standards such as ISO19650 and a Common Data Environment (CDE) to ensure that the project information it delivers to its customers meets the highest standards. SWECO engaged Autodesk Solution Provider Cadline to conduct a top-down review of its readiness to gain ISO19650 certification as well as provide a robust CDE infrastructure.

Project goals

The main goal was to introduce a framework for delivering projects using BIM in a structured and highly collaborative manner and would meet the information management requirements of a broad range of clients. The framework should be compatible with the newly released global BIM standard, ISO 19650, such that it could be successfully audited and certified by a recognised auditing body. A key part of the standard, and a priority for SWECO, was to establish a Common Data Environment to store, control, share and report on project data. The CDE should support the current design workflows whilst applying the controls around access permissions, modeling naming and project status that the standard requires.

Solution

As well as providing guidance on best practice for delivering BIM projects, developed through supporting our customers in the UK, Cadline delivered specific workstreams related to process documentation and establishing a Common Data Environment. Supported by John Jansson, the Head of Technology at SWECO, Cadline supported an ambitious programme of change within the organisation which required us to deliver the project in a relatively short timeframe. Along with our specialist partners, Cadline provided support to the team throughout the successful ISO 19650 Gap Analysis and Audit carried out by the BSI. This led to SWECO achieving BIM stage 2 certification in the Netherlands. We implemented the CDE based on Autodesk Vault and customised functionality, developed specifically for the project workflows at SWECO.

Business outcome

SWECO Netherlands became the first engineering consultancy in the Netherlands to achieve the ISO 19650 certification following a successful audit of its BIM processes by the BSI. As lead consultant on this project, we worked with SWECO to develop its people, processes and documentation to support a fully digital delivery capability. The certificate has become the international standard for the management of information over the entire lifecycle of an asset through the adoption of digital construction workflows. The audit itself is a rigorous assessment of an organisation’s ability to deliver BIM projects to the ISO 19650 framework. The framework supports well-structured processes for managing of project information including exchanging, recording, versioning and organising for all project stakeholders.

Conclusion

Since their ISO 19650 certification, SWECO has reported it is now able to successfully deploy ISO 19650-compliant data models within four weeks - a process that had previously taken up to six months. They have also published 10% efficiency savings on project programs and up to 30% in interdisciplinary review processes due to improved information management. SWECO's success has been recognised by the Advancements in Project Delivery Award in the Bentley Year in Infrastructure Awards.

Project summary

    Duration & delivery

  • 30
  • 2020-07-01

    Autodesk solutions

  • AutoCAD
  • Revit
  • Architecture
  • Engineering & Construction Collection
  • Vault Basic

    Services provided

  • Business Transformation Services
  • Generative Design
  • Virtualization
  • Cloud Migration
  • Sustainability
  • BIM Standardization & Accreditation
  • Custom Application Development
  • Security Management
  • Business Transformation Consulting
  • Solution Optimization Services
  • Workflow Documentation
  • Business Analytics & Reporting
  • Business Process Assessment & Documentation
  • System Implementation
  • Configuration & Deployment
  • Solution Adoption Services
  • Technical Support
  • Product Activation & Onboarding
  • User Workshops & Community
  • Customer Success Management
  • Product Training

    Customer industry

  • Architecture, Engineering & Construction
More success stories

Sale Layout, 3D Visualisation

This customer is leading the transition towards a 100% renewable energy future. As an Energy System Integrator, it understands, design, builds and services optimal power systems for future generations. Its offering includes ultra-flexible internal combustion engine-based power plants, hybridized solar power plants, energy storage & integration solutions, as well as gas to power systems. The technical sales team at the customer believed that the existing design communication methodology used during the sales process was significantly extending the early stages of the project. Technical design elements were typically communicated using 2D drawings even when some of the early design activities had been carried out in 3D. This resulted in a disconnected workflow and a less than optimal experience for their clients.


View

Licence Optimisation Project For A Global Engineering Consultant

KONGSBERG specialises in developing advanced technologies, to provide extreme performance for extreme conditions. Working together as a global team, it has created an integrated portfolio of solutions, for businesses, partners and nations operating from the depths of the sea; to outer space; to the digital frontier. It uses many of the Autodesk products throughout its global team, across different divisions, business units and countries. As Autodesk retires subscription plans based on serial numbers and moves to a model where software entitlement is based on named users, Kongsberg faced the challenge of transitioning most of its users to this new model. As a long-standing customer of Autodesk, it had selected multi-user concurrent licencing historically, and over time it had based its procurement, software asset management and deployment processes on this model.


Managing Change Effectively: How Autodesk and Cadline Helped Smitsair to Automate its Design Process, Free Up Time and Support its Business Growth Initiatives

Cadline was originally introduced to Smitsair to conduct a review of their design, configurator and data management systems and processes. It was established that there was a product configurator in place in Smitsair’s ISAH system, but it provided 2D drawings which were generated with scripts that could no longer be maintained. In addition, to process non-standard orders meant an engineer had to manually edit the flat patterns in 2D which is much more difficult than if these could be edited using a 3D model. Drawings and project files were linked in the ERP system by using shortcuts within specified tabs, but the files itself were stored in Windows folders with no version or revision control. For one-off projects the team used 3D modelling software, but this was no longer supported so the Smitsair team needed to switch to a 3D tool that was capable of both driving design automation and producing one-off projects on the same platform.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.