Connected Workflow using Autodesk solution in Design Firms

Connected Workflow using Autodesk solution in Design Firms

Customer challenge

Yasser Al Beltagy Architects (YBA) was established in the year 1995, in Cairo, Egypt, Led by founder, principal and chief designer Yasser AL-Beltagy. YBA is a full-service architecture, urban, landscape and interior design firm. Over the years Yasser Al Beltagy Architects worked on different types and sizes of projects, in and out of Egypt more than 1000, projects such as Residential, Public, Corporate & Office buildings, Educational & Cultural projects, Hotels & Resorts, Recreational projects, Industrial projects, Religious and Commercial Projects. 


YBA Participated in 33 worldwide competitions, wining; 10 first place prizes, 4 second place prizes, 3 third place prizes, 2 honorable mentions and was awarded 3 architecture awards. In June 2003 YBA and Dar Almimar joined alliances until February 2011. The merging of the firms, coupled with the extensive experience of the principals, creating a diversified practice resulting in successful broad range projects including worldwide competitions and large projects. YBA's philosophy is largely based on following the highest standards of ethics and business conduct. "We assume our client's privacy and provide them with the best services". The guidelines placed for achieving that philosophy are * Satisfactory Design for our Clients * Vision and Innovation * Enlightenment and Technology * Investing in People.

Project goals

As a disconnected workflow - YBA was taking too much time in editing the changes requested from their client and their impact on the project data through 3D shots, Technical Drawings and BOQ. 

YBA has addressed that issue and figured out that connected workflow using BIM technology and the power of the connected workflow will reduce the time and gets the technical team, Design team and the visualization team are aligned on the same line. 


Therefore, three goals were defined as below:

  • Reduce time by 20% in generating 3D shots.
  • Reduce Rework by 20% in the technical drawings & BOQ.
  • Reduce time by 10% taken in applying design modification and its impact on 3D rendered shots.

Solution

With connected BIM workflow - the design team starting the design in Autodesk Revit, then they send this model to the visualization team to start exporting some shots to get client approval once they had the approval then the technical team will start by develop the model and increase the level of details to start in producing Technical drawings and BOQ, at this moment some changes may happens due to technical issues, as-built condition, client request changes to reduce the construction cost, the time impact of these changes in the connected workflow will be reduced on the technical side or in the visualization side. 


The model is now updated with any modification requested from the client, the visualization team will take this updated model and generate the shots without any modeling modification which reduce the time that taken in the rework. even if the exported visualization media is a video, now with twin motion they have the model updated all they need to do is to adjust lighting and make some modification in the environment then render. All this process previously was taking too much time to in the modification that will be made separately in the design team, technical team and Visualization team to get the final result accurate and fast as much as possible. 

Business outcome

Since they become faster in their production, the increased freedom they now have for design and production has allowed YBA to be much more open to advancement. As they are able to work on several projects at once, they now have been able to increase their business.

Conclusion

Businesses should invest in cutting-edge design and marketing solutions to easily reach out to new customers. Furthermore, rendering and animation technologies make it easier for existing clients to evaluate their products and submit correction requests without incurring significant additional costs. As a result, BIM connected work flow has an impact on every area of production, including time, money, flexibility, and the avoidance of costly mistakes.

Project summary

    Duration & delivery

  • 30
  • 2023-06-01

    Autodesk solutions

  • Architecture, Engineering & Construction Collection
  • Revit
  • 3ds Max

    Services provided

  • BIM
  • BIM/CAD Standards
  • Workflow Optimization
  • Animation
  • Rendering
  • Virtual Reality (VR)

    Customer industry

  • Architecture
  • Civil Engineering
  • Construction Design
  • Facility Management
  • MEP Engineering
  • Mining & Quarrying
  • Other Engineering Industries
  • Structural Engineering
  • Utilities & Telecommunications
  • Water & Wastewater
  • Film & TV
  • Games
More success stories

Katamya Hills - From Concept to VR

Sabbour Consulting Company's mission is to serve and develop communities through the provision of high quality engineering consultancy that are aligned with the international standards. Katamya Hills is a residential built on 156,000 sqm. Sabbour had an issue that customers could not see and visualize the final properties and feel the experience. Also, top management couldn't see the final compound and see live the experience.


View

Madinaty 4 Seasons: From Diversity to SSOT

Talaat Moustafa Group (TMG) Holding is a leading conglomerate with special emphasis on developing integrated communities, including but not limited to mixed-use real estate and hospitality projects across Egypt’s key cities, with a land bank of 53 million square meters. The group has a strong track record of 50 years in the housing and real-estate development industry, having developed over 33 million sqm of land and sold over 90,000 units. TMG had an issue in centralizing all project data in one place. So, Autodesk BIM 360 Docs plays a crucial role in coordinating and managing all project data in a single source of Truth (SSOT). moreover, all letters between contractors and consultant were managed manually via emails, hard copy letter or using WhatsApp application.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.