Back to Profile

Contact partner

Success Story

USB Greatly Improved Productivity with BIM 360

USB Greatly Improved Productivity with BIM 360

Customer challenge

As with any project including multiple stakeholders, with team members that are new or pulled in from various organizations, communication posed the greatest challenge. Initially, United Singapore Builders (USB) worked semi-independently which resulted in Autodesk Revit models residing in various locations, like the server and individual modeler’s computer, creating silos of information. In some cases, drawings and BIM models were shared via emails and other third party applications.

Project goals

“Within a short period of time from the start, we were already scrambling to fix drawings, manage change orders and trying to get everyone on the same page.” – Mr Chiang Heung Chin, General Manager, United Singapore Builders Pte Ltd. Critical Project Goals included: 1) Improved communication and collaboration across multiple project stakeholders and 2) Reduced project errors

Solution

In December 2019, USB engaged the services of CSG Software Pte Ltd, a Gold partner for Autodesk in Singapore. After evaluating the “project health”, CSG proposed a combination of Autodesk products and CSG services that included: 1) Architecture, Engineering & Construction (AEC) Industry Collection 2) AutoCAD LT 3) BIM 360 Design 4) Training 5) Consulting and hand-holding sessions

Business outcome

Significant business outcomes included the following: 1) Project errors were reduced with minimized confusion among stakeholders. 2) Project errors, due to team members working on different versions of drawings, were quickly eliminated - now everyone knows where the latest set of project files reside. 3) Work from anywhere: With the COVID-19 pandemic, working from home became the new normal. With BIM 360, USB was still able to work and maintain coordinated information real-time.

Conclusion

Team productivity was greatly improved. Too much time was previously spent on resolving clashes as there was no real-time access to the latest version of the project files. With the implemented BIM 360 Design plus proper processes and workflows, USB can now spend less time coordinating and more time designing. USB now has a centralized data location to manage BIM models in a more coordinated and collaborative way.

Project summary

    Duration & delivery

  • 2190
  • 2018-11-30

    Autodesk solutions

  • Architecture
  • Engineering & Construction Collection
  • BIM 360 Docs
  • BIM 360 Design

    Services provided

  • Cloud Migration
  • Collaboration & Productivity
  • Product Training

    Customer industry

  • Architecture, Engineering & Construction
More success stories

Kingsmen uses Autodesk to Deliver the Ultimate Brand Experience to their Customers

Kingsmen started out in 1976 with a vision of being different and a clear commitment to quality, creativity and excellent service. With their roots in communication design and production, they have since been on a mission to harness the power of design and impactful digital experiences to tell engaging stories that bring brands to life. Kingsmen had wanted to implement a standard tool across all departments and projects. Using Autodesk 3ds MAX and Autodesk Architecture, Engineering & Construction Collections, we are able to produce and work on drawings and designs that are easily shared and understood internally and externally.


View

Motionwell: From Machine Parts Seller to Mechanical Designs

Founded in 2014, Motionwell Automation Pte. Ltd. is committed to provide quality precision custom-made machined parts and structure fabrication with an uncompromising emphasis on quality and service. They provide value-added services and achieve innovative ideas in processing, manufacturing, and jig & fixtures assembly. ​Pandemic has put all the organizations and businesses around the globe in trouble. Due to lockdowns and isolation measure to control the spread of this disease, organizations have been in constant pressure and are striving a lot to be able to continue their business activities and operations during this adverse time. Additionally, rise in competition, global players, continuous developments and advancement in technology, need of unique and innovative ideas are also some of the potential challenges that Motionwell Automation Pte Ltd. is experiencing.


Cityneon adopts Autodesk Premium Plan

CityNeon is experiencing several issues in its way to continue to offer such diverse entertainment to its global audience. Some of these obstacles are because of the pandemic as the novel corona virus outbreak has brought several adversities for the company in acquiring as well as implementing different design and manufacturing solutions. This is particularly because of the social distancing measures that the corporate world has to observe in order to limit the spread of this viral disease. Moreover, with several entities local and overseas, software licenses purchase, and management was decentralized. CityNeon HQ in Singapore has very low visibility on the usages as well. There is also a huge risk with regards to the license compliance since there is no one single administration and control point. So, CityNeon is striving for a local player to provide them the the required services and game up their business.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.