How BIM Changed Russel and Yelland’s Workflow

How BIM Changed Russel and Yelland’s Workflow

Customer challenge

Russell and Yelland Architects was tasked with a complex design project. The courts and generous foyer must comfortably cater for 1500-person events: an attractive income proposition as a community space for hire. Additionally, Caleruega Hall saves the school significant annual budget in off-site rental for whole-of-school events. Maximising the gym’s footprint without negatively impacting a vital pedestrian thoroughfare would prove challenging.

Project goals

For a long time, Russell and Yelland Architects was challenged by external forces (like new technology, consultants, clients, you name it). Ultimately, it came down to re-examining their business and the way they work. They were determined to make the delivery of BIM work, so they reviewed a number of projects, some of which worked and some of which didn't, and tried to find some common elements which would help find the Company a new direction.

Solution

The solution was for the gym’s main student entry to present as destination on the pathway; the public entry’s hooded twin. Running BIM successfully and consistently across a variety of project types still has a way to go. There are many issues in industry outside of the typical Architectural practice which need to also change for this to happen. Over the years, we have strived to develop workflows which allow for these obstacles and give us license to maneuver through them.

Business outcome

The project team worked in a collaborative manner under a managing contractor procurement model. Incorporating the builders’ input early in the project proved beneficial to cost and schedule, saving weeks of labour on-site. Carefully administered, Caleruega Hall was delivered on time and under budget.

Conclusion

The project team was empowered with more information and could make better choices. This information flow ensured all stakeholders were involved in decision making. The constant flow of information, across the team from design, through manufacture into construction, meant the design process didn’t need to stop at the commencement of construction. Producing quality design outputs in almost real time as the project developed lets us continue to optimise the solution from beginning to the end.

Project summary

    Duration & delivery

  • 750
  • 2018-11-01

    Autodesk solutions

  • Revit
  • ReCap
  • Navisworks Manage

    Services provided

  • Business Transformation Services

    Customer industry

  • Architecture, Engineering & Construction
More success stories

Designing Functional Industrial and Commercial Products with Accuracy using Autodesk Inventor

The initial challenge is to design with accuracy using Autodesk Inventor while being fully functional. Design for manufacture and testability are crucial aspects of the design process - while most understand design for manufacturing, many overlook the need of design for testability. Design for testability means that the designer knows how to test that a product is optimally functional - to be able to prove through testing, during the manufacture and assembly process, that every component is maximally effective and fully complies with the specifications. Design for testability and strict quality control are a standard part of ARIDs design process, ensuring that each unit produced is of the highest standard.


View

How Revit Streamlined the Workflow for the Westminster School Learning Hubs Multistage Project

Working with the Westminster School’s approach to teaching and learning, the shape, layout and relationships between spaces became more complex when compared to the traditional design of learning spaces. This meant that coordination within the Design Team was important and being able to explore and refine ideas through a 3D medium meant we could be assured that our outcomes would be cohesive for the interior and exterior of the building and aligned with the school’s pedagogical practices.


COSTCO – New Zealand’s Largest Bulk Retail Facility

MSC was tasked with the design and construction of a large and complex structure - New Zealand’s largest bulk retail site, a multi-level facility built over unstable ground. Site characteristics include a car park level and fuel station on-site. The structure includes three levels – 1 car park level and 2 shopping levels approximately 40,000 sq/m.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.