Autodesk Revit Provides ESCA Incorporated with the Design Coordination Needed for their One Filinvest Project

Autodesk Revit Provides ESCA Incorporated with the Design Coordination Needed for their One Filinvest Project

Customer challenge

Challenges with coordination is what ESCA Incorporated faced during their ‘One Filinvest’ project. They needed to find a solution to be able to interpret communications throughout the project in the model to provide the customer with up to date design. It was essential that drawings from the designers were coordinated, the designed model speaks to each other and mirrors the design as discussed during the design coordination meetings.

Project goals

The project goals of ESCA Incorporated were the following: 1. Design Phase: identify and resolve problematic areas and provide bill of quantities to the owner 2. Construction Phase: provide shop drawings that will be used on-site by the contractors and have initial basis for construction and as-built

Solution

ESCA Incorporated found its solution to resolve the challenge that they encountered and manage to model the design intent. Autodesk Revit updates the design model to construction model and it helped the project in identifying the possible conflicts before executing at site works. Steel connections were also considered based on fabricator's design. During construction, the tapping point location and elevations were also identified and the models were updated to actual site condition.

Business outcome

With Autodesk Revit, consistent and well-coordinated designs and models were achieved. With the help of their new solution, ESCA Incorporated now maintains excellent quality and cost-effective engineering services. ESCA Incorporated has also ensured business continuity with Autodesk and our team at Maximum Solutions Corporation is always there to provide prompt support to ESCA Incorporated, whenever there are issues with the licenses on site.

Conclusion

Open communication and collaboration is important for the successful outcome of a project because it involves everyone in the planning stage up until the execution. It is also necessary that all stakeholders have the same goal and were able to create a successful workflow. Utilization of Autodesk solutions also takes part when it comes to sustainability since it reduces the carbon footprint and electricity consumption.

Project summary

    Duration & delivery

  • 1250
  • 2020-01-31

    Autodesk solutions

  • Revit
  • Navisworks Manage
  • AutoCAD

    Services provided

  • Technical Support
  • Collaboration & Productivity
  • System & Software Maintenance
  • System Integration
  • Product Activation & Onboarding
  • Software Asset Management & Usage

    Customer industry

  • Architecture, Engineering & Construction
More success stories

Porsche Design Tower - Luxury Residential Skyscraper in Sunny Isles Florida

Intelassist Inc., had been an outsourcing provider of architectural shop drawings, Autodesk take off and Autodesk Revit/ Autodesk BIM models for the past ten years. Autodesk are in partner with Maximum Solutions Corporation since the beginning to provide correct, accurate and helpful tools, subscriptions and products that would best suit the needs in this project. Luckily, there was no roadblock or challenge encountered for this project except for minor revisions that are part of the process. They focus on quality in everything they do and understand that by selecting Intelassist, they are entrusting to deliver exceptional customer services and ability to perform each customer interaction with respect and excellent outcome.


View

Northland Mechanical Engineering Services Specialized in Stainless Fabrication Works

There were no problems/ challenges encountered related to design and drawings since Autodesk Solutions did helped to prevent anticipated shortcomings. Maximum Solutions Corporation has provided Northland MES a good customer support and assistance from presales and post sales.


Proton Beam Therapy Centre by University College London Hospital

SIGMABear Incorporated was created with the primary purpose of providing large capacity engineering support to the construction industry with a practical approach using any state of the art technology. Time and Quality, are the biggest challenges throughout the delivery, execution, and business workflow, to ensure that they deliver the project on time with the best quality SIGMABear Incorporated needs to be flexible whenever there are changes and should be proactive.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.