Customer challenge

The AECI Mining Drawing Office (DO) utilized Autodesk software that for the most part enabled the departmental deliverables as highlighted and prescribed by, for the most part, internal customers. With a more focused departmental drive to improve the Customer Satisfaction Index (CSI) and providing customer projects with improved On Time In Full (OTIF) capabilities, it became apparent that the Autodesk software employed at the time and the utilisation of said software would need to be reviewed and amended to better archived departmental objectives.


The aspect of strategic alignment was also highlighted as a major concern because, at the time, there was very little synergy with DO internal operations in being aligned to the overall company strategy. This strategy being a reduction in defects, improved overall delivery timings on equipment manufacture and delivery, improved drawing quality with quality measurements that were in line with Six Sigma.


The DO faced many internal challenges as well and these had to be addressed as well. Efficient utilisation of the software in the design area as well as the data repository were also scrutinised. Internal Gap and SWOT analyses were carried out to identify focus areas, which could then be leveraged to implement a process of high impact changes that would evaluate CSI and OTIF objectives whilst at the same time initiate the transition phase of improved software utilisation, data management and Do functioning that would allow for alignment to overall Company strategy.

Project goals

A Drawing Office Consolidation of Software and Data File Repository that works and provides enhanced project delivery and management of data enabling heightened project delivery and customer satisfaction. An overall solution that enables the integration of engineering design functions and data management into a fully functional quality Management System that is compliant to AECI Mining’s ISO 9001 listing through the British Standards Institute.

Solution

Implementing the revised strategy of software consolidation and data management was highly successful with improvements in relying on 2D drawings and utilising a more 3D based system enabled the DO to engage with customers on a level previously vacant. The process of designing with a different mind-set where the designs could be shared and reviewed with customers enabled the DO to streamline internal processes and improve on lead times to delivery of projects.


The mover from Autodesk Vault Basic to Autodesk Vault Professional enabled a robust system of ensuring the concept of “One Version of the Truth”. This was a major issue before the strategy was implemented and with the assistance from Modena Onesolve the adoption of the new repository changed the management of data completely.

Business outcome

Through numerous iterations and consolidation of software, the DO has been included into the AECI Mining ISO listing and in as much has implemented a fully functioning Quality Management System. In terms of draughting and file storage, the consolidation of these and the move from Autodesk Vault Basic to Autodesk Vault Professional has allowed for much improved efficiency and the achievement of CSI and OTIF objectives. The department now consistently achieves scores of above the targeted 85% in both areas.

Conclusion

As a final aspect of the enhancements achieved, the DO has now been able to re-educate customers in terms of how the processes employed for when design work is carried out and the creation of data packs is achieved. The ability to view 3D models has resulted in much more customer involvement where reviews are conducted within a cross functional team and the understandings of what is being designed are far more easily understood than when the reviews were carried out in the 2D environment.


Considering the Return On Investment for license costs and subscription fees the DO has achieved financially acceptable levels within the accounting structure of the company. The DO is well on its way to becoming a profit centre versus the current status of a cost centre. It is envisaged that by end Q2 of 2024 this will be achieved.


The DO can therefore, categorically state, that without the extensive input and assistance provided by Modena Onesolve, the turnaround with in the DO and its ability to deliver services to customers above the 85% efficiency rate would not have been achieved.


The partnership that has evolved over time between the DO and Modena Onesolve has delivered exceptional dividends to AECI Mining as a whole and the DO is committed to take this partnership to new heights and continue to tap into the expertise provided by Modena Onesolve. The industry that AECI Mining operates with in is ever changing and to think that the DO can face these challenges alone would be naive and short sighted.


Project summary

    Duration & delivery

  • 100
  • 2023-09-01

    Autodesk solutions

  • Vault
  • Vault

    Services provided

  • Migration, Data Loading & Interoperability
  • Assessment of Needs
  • Implementation
  • Process Automation
  • Strategy & Planning
  • Workflow Optimization
  • Optimize Accelerator Delivery
  • 3D Modeling
  • Design/Sales Automation
  • Manufacturing
  • AEC
  • Design for Manufacturing
  • Manufacturing
  • Software Development & Customization
  • Installation
  • Configuration & Deployment
  • System & Software Maintenance
  • System Integration
  • Updates & Upgrades
  • Training

    Customer industry

  • Mining & Quarrying
  • Other Engineering Industries
  • Additive Manufacturing
  • Design
More success stories

K/M2K Saves 2 Hours of Work per Design Review through Better Remote Teamwork with Autodesk BIM360

During the Covid-19 Pandemic of 2020, K/M2K Architecture and Interior Design found themselves struggling to navigate remote working during a national lockdown. Traditional methods of file sharing were found inefficient and lacking for a team that needed to communicate a lot of information at a high frequency.


View

From 2D AutoCAD to Intelligent iLogic-driven 3D Inventor Designs

Palian was using 2D AutoCAD in a primarily 3D dominated field, struggling with collaboration between branches and the length of time it would take to make relatively small changes to designs. Getting drawings and quantities to the sales team for quotation purposes took longer than desired and a lot of manual user calculations and input was still needed, which increased the change of costly "human error" mistakes.


DRA Global takes on Project Delays with Innovative use of Technology

DRA Global had to overcome a delay of 25 days over deadline for their Sierra Leone Project, so they needed to find a way to get that time back to avoid running over with this project. The impact of this was on their future expansion projects within the same mine, in Sierra Leone, which would be double the size of the original project.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.