Description
The California Air Resources Board (CARB) has selected the design of its new Southern California headquarters located on a 19-acre site near the campus of University of California Riverside. The approximately 380,000-square-foot facility will be one of the largest and most advanced vehicle-emissions testing and research facilities in the world. It will also be the largest “net-zero energy” structure (producing as much energy as it uses) of its type in the nation. Learn how Hensel Phelps and U.S. CAD used the Architecture, Engineering & Construction Collection to procure, win, and manage a project through design into construction. Topics will include using Navisworks software as a starting point in design validation for AR/VR environments, using 3ds Max software with drone data to implant design in existing spaces, managing detailed level trade partner files for field validation using drone data and laser scans, using Civil 3D files to help quantify and manage earthwork, and validating coordinated 3D models in the field via use of tablets and BIM 360 Glue software.
Key Learnings
- Learn best practices to set up a project in the cloud in BIM 360
- Learn how to use Revit Models
- Learn about Civil 3D models
- Learn how to use drone data
Tags
Product | |
Industries | |
Topics |