AU Class
AU Class
class - AU

Providing the Best Value for Your Budget Case Study: Zoetis

Share this class
Search for keywords in videos, presentation slides and handouts:

    Description

    One of the biggest challenges that the architecture, engineering, and construction industry faces is conveying the design intent in a manner that reduces constructability and rework complications at all handover stages of a project's lifecycle. This presentation will discuss how early contractor involvement and an integrated design and construction process can help to achieve design optimization through the use of virtual design and construction (VDC) tools like Building Information Modeling (BIM). On the Zoetis project the Construction Team was involved in the earliest stages of the project-performing task, including quantity analysis and cost trending, discipline constructability, and coordination review. Because the reviews happened by the time construction documentation was issued, the firm avoided the majority of the problems that normally occur during construction. Additionally, the Construction Team has seen a reduction of 50% of the normal schedule time for the coordination of the project. This has enabled the team to provide the client, Zoetis, with value for its budget.

    Key Learnings

    • Learn about key project-planning tools
    • Realize the benefits of model-based quantity takeoff
    • Understand integrated design build approach
    • Learn how to identify client advantages on schedule and cost

    Tags

    Product
    Revit
    Industries
    Civil / Site development contractors
    Architecture
    MEP engineering
    Structural engineering
    Topics
    Civil Engineer
    Mechanical Engineer
    Cost Engineer
    Construction Manager
    Design
    Virtual Design & Construction
    Construction Management
    Construction Documentation
    Building Information Modeling (BIM)
    Design Optimization
    CAD Management & IT
    Computational Design