AU Class
AU Class
class - AU

Checking the Gut Check: Validating Project Schedules Using Lean Methods and Model-Based Planning

Share this class
Search for keywords in videos, presentation slides and handouts:

    Description

    Contract schedules that are proposed during preconstruction can define the success or failure of project. Too often they are based upon a scheduler's gut check. Building Information Modeling (BIM), along with an integrated Lean workflow, is enabling schedulers to better predict flaws within the schedule and communicate expectations during construction. Currently, Autodesk and DPR Construction have teamed up to create an integration between Autodesk® Navisworks® software and the Last Planner® software, Ourplan, to visually track schedule commitments through the model on a three-week look-ahead. This integration enables DPR to track subcontractor tasks through the model while obtaining more validated input by visually communicating the scope of work expected and indicating potential roadblocks. We will present the current workflows while also proposing future needs for development to use quantity data to derive production rates for future projects, thus helping to take the guesswork out of critical preconstruction scheduling.

    Key Learnings

    • Advocate for software development to support :Lean-model-based workflows
    • Describe the full lifecycle of a model from proposal to construction
    • Explain the value that model visualization of a schedule can have
    • Learn Lean workflows related to Last Planner scheduling

    Tags

    Product
    Navisworks Manage
    Industries
    Civil / Site development contractors
    Site Development (General civil engineering)
    Architecture
    MEP engineering
    Structural engineering
    Topics
    Teacher
    Production & Operations Manager
    Engineer
    Technology Manager
    IT Manager
    Marketing / Sales Manager
    Construction Manager
    Software Licensing & Deployment
    Automation, Integration, & Customization
    Building Information Modeling (BIM)
    Customization
    Buildings
    Virtual Design & Construction
    Software Development