• One Water Blog

    • Storm, sewer, flood
    • Drainage design
    • Water distribution
    • Asset management
    • Operational analytics
  • Customer stories
  • Product news
    • InfoDrainage
    • InfoWater Pro
    • InfoWorks ICM
    • InfoWorks WS Pro
    • XPSWMM
    • All roadmaps
    • Asset management
    • Drainage design
    • Operational analytics
    • Storm, sewer, flood
    • Water distribution
    • Info360 platform


  • Trinity River Authority: Streamlining water treatment plant operations with an InfoWorks ICM digital twin

    Tasked with protecting and maintaining the largest river basin entirely within the state of Texas, the Trinity River Authority (TRA) has its work cut out for them. In the northern region of the Trinity River Basin, TRA operates five major wastewater collection and treatment systems serving municipalities in one of the fastest-growing metropolitan areas in…

    Customer stories


  • 10X speed improvements with new Water Quality Solver in InfoWorks WS Pro 2025.3

    InfoWorks WS Pro 2025.3 is here, bringing with it a new water quality solver option for improved speed and accuracy and improvements to baseline objects. Our teams were able to compare the new water quality solver with a test model and were able to get equivalent results in the new solver with a much larger…

    Product news


  • Steady state vs extended period simulations in InfoWorks ICM: How to decide

    When modeling hydraulic systems in InfoWorks ICM, one of the most important decisions is whether to use a steady state simulation or an extended period simulation (EPS). This guide explains the difference between steady state and extended period simulations, when to use each, and how to make the right choice for your project. It is not uncommon for numerical…

    Hydraulic modeling


  • AMP8 opportunities: Biodiversity Net Gain requirements will give SuDS a big boost

    One of the most important things UK water regulator Ofwat wants to see water companies use AMP8 funding to achieve is elevating the importance of Biodiversity Net Gain (BNG). We wrote about it in our latest white paper ‘AMP8’s unprecedented opportunities’, part of which we’re excerpting here. A change that makes society better is one…

    Storm, sewer, flood


  • InfoWorks ICM: The Training, Tutorials, and Technicals that Autodesk provides

    Getting started with stormwater and hydraulic modeling software may feel like a big task, but it doesn’t have to be an expensive one. We’ve compiled comprehensive training courses to get you and your team up to speed on InfoWorks ICM, and they are all entirely free. With our series of video and written instructional models,…

    Product news


  • 1D and 2D modeling with HEC-RAS & InfoWorks ICM: Differences, similarities, and an integrated workflow

    We walk through some of the similarities and differences between HEC software and InfoWorks ICM. Some people use both - we'll tell you why.

    Storm, sewer, flood


  • AMP8 opportunities: Solving the UK’s CSO problems with hydraulic modelling

    The recent AMP8 funding cycle is perhaps the best chance for water providers to secure funding for changing the way they monitor and solve for CSOs. We’ve written about it in our new white paper, AMP8’s unprecedented opportunities, a portion of which we’re excerpting here on the One Water Blog. How software can help manage…

    Storm, sewer, flood


  • How Info360 Asset is solving the common challenges of CCTV in 4 steps: upload, collect, review and analyse

    Operating and maintaining water and wastewater networks requires sifting through vast volumes of data, with a significant portion derived from CCTV inspections, which is the primary method our industry relies on to assess the state of underground collection system assets. These inspections provide pivotal insights that underpin accurate spend forecasting, pipe rehabilitation, replacement, and capital…

    Asset management


  • Water Drop workflows: sewer network storage, ATO, VSPs, and automatic catchment generation

    Generally, Water Drop videos are recorded and produced by our North American technical team, but this edition is happy to welcome some expertise from ‘the land down under’! Welcome Tran Nguyen as she tackles how to utilize the Area Takeoff Method in InfoWorks ICM and Matt Piggot who demonstrates a hydrologic workflow between InfoWorks ICM…

    Water Talks


  • Harnessing the power of InfoDrainage in Canada: regional and customizable settings

    As urban areas continue to expand and our drainage infrastructure continues to be pushed to the limits, managing stormwater and urban drainage with old methods has become untenable. This isn’t just a regional problem, but a global one. Our teams often get asked, “Does InfoDrainage work in my country/region?” Generally speaking, the answer is going…

    Drainage design


Previous Page
1 … 14 15 16 17 18 … 41
Next Page

Autodesk

Company overview
Careers
Investor relations
Autodesk Trust Center
Newsroom
Diversity and belonging

Autodesk Foundation
Sustainability
Contact us
Students and educators
Affiliate program
Autodesk Research
Design & Make with Autodesk

How to buy

View all products
Buying with Autodesk
Renewal options
Find a reseller
Sales and refunds
Choose your subscription plan
Pay as you go with Flex

Support

Product support
Manage your account
Download and install software
Autodesk Product Status
Education support
Contact support

Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © 2026 Autodesk Inc. All rights reserved