Skyline Electric realized that avoiding projects with BIM requirements was potentially costing them business. “The whole process seemed very daunting and we didn’t understand what BIM truly was,” said Brandon Willard, emerging technologies director for Skyline Electric, West Valley City, Utah. “We thought it was a software program and we were doing well in our niche markets, so it was one of those ‘if it’s not broke, don’t fix it’ mentalities.”
Skyline Electric added both people and technology because that was part of the firm’s plan to eventually bring BIM capability in-house. However, Willard noted, a contractor doesn’t have to spend much of anything when engaging with a BIM consultant. “We really didn’t know what we didn’t know at the time,” Willard recalled, “but in hindsight, there were projects being developed that we were not invited to bid because we didn’t have experience with BIM."
Willard contacted U.S. CAD’s Salt Lake City-based construction services director to see if the U.S. CAD team was a good fit for the Skyline Electric culture. Willard found U.S. CAD’s ability to train contractors on the entire BIM process intriguing and the rest, as they say, is history.
Willard found that it forced the contractor to clarify thinking and planning for a project. “We have definitely seen advantages because of the adoption of the BIM process,” Willard said. “We are finding that it is a tool and not a solution to all construction problems. It has forced us to plan further ahead, which, in my mind, is a huge risk mitigation tool. Once we get through the coordination process, the projects definitely seem to run more smoothly than they would have otherwise.”
“I have found huge success in my life by finding someone who has achieved something that I would like to achieve and then shadowing them to get me through the learning curve as efficiently as possible,” Willard said. “This is what U.S. CAD is doing for us currently as we are receiving training from them. There are way too many options out there and someone could spend a lot of time and money trying to figure out the best path...but U.S. CAD is showing us what I believe is the best route."
Project summary
Duration & delivery
Autodesk solutions
Customer industry
Parallel Technologies Partners to Deliver Fast-Track, Comprehensive Security Solution
When a premier client needed help designing a security solution for a large data center, Parallel Technologies needed a partner to help it scale up with ease. The new two-story 100 MW capacity facility included over one million sq. ft. of data center colocation space. John Ray, head of Design and Estimation, knew his team would need some help to meet the tight project timeline. Along with large scope and scale, the security systems had to be fully designed in Revit to facilitate clash detection.
Steinberg Hart Transforms Network Connectivity to Foster Improved Collaboration, Creativity and Connections
The rapid evolution of BIM and interoffice collaboration in the last five years has been a steep learning curve for many in the industry. By early 2019, Steinberg Hart needed to prepare for a new technology shift that would require some outside expertise. According to Gautam R. Shenoy, BIM/VDC Director at Steinberg Hart, a growing demand to use Autodesk BIM 360 web-based applications to streamline communication among customers and partners was emerging.
Contact Partner Finder for help using the online search tool and more. The Autodesk Assistant can help with Autodesk products, answer questions, or send you to an agent.
Partner Finder Terms of Use
By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.
Translation tool disclaimer
This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.