Description
For effective clash resolution, it’s essential to notify the design partners about the clashes in a timely manner. It is also imperative to maintain an auditable and trackable record of notifications related to the clash resolution process. In this Connected Coordination Level 2 lab, we’ll build upon where we left off in the 2023 Connected Coordination lab, and learn to use the power of the closed-loop issue management system to assign, notify, resolve, and close clashes on a project. You’ll also learn about the Autodesk Construction Cloud Issues add-in for Revit software that allows design teams to download clash issues directly within Revit to highlight the clashing elements and take action to resolve them. You’ll learn how the closed loop issue management system keeps all the stakeholders notified every step of the way, allowing for an effective clash management system. Finally, you’ll learn how to export reports of all the active clash issues and link them to Power BI for the relevant stakeholders.
Key Learnings
- Review automated clashes and convert valid clashes into non-issues (valid penetrations).
- Learn about creating clash issues and notifying the design partners with clear information about how to resolve those clashes.
- Learn how to download clash issues in Revit to modify the clashing items and updating the clash status.
- Learn how to generate clash issue reports and connect them to Power BI.