411 Results
Topics
Building Operations
Industry Talk / Las Vegas 2017
Connect and Construct - Case study: Streamlining handover and jump starting maintenance for the facilities team
In August 2015, Arkansas Children's, Inc. announced plans to build a freestanding children's hospital in Springdale, Arkansas. The new building, Arkansas Children's Northwest, will include 235,000 square feet of inpatient beds, emergency care, diagnostic services and clinical space. The hospital's construction and facilities team assembled a detailed set of data specifications to streamline the handover of the building and jumpstart operations & maintenance. The goal was to have all equipment data populated in the CMMS (maintenance management system) by substantial completion in the fall of 2017, to allow for critical maintenance processes to be in place prior to completion. To realize that vision, TME led an initiative to drive the successful transition and handover of asset data before the end of the project. This presentation walks through the planning, design, and construction phases of the project as well as the beginning of operations.

Mark Mergenschroer, BIM Application Specialist, Bernhard TME

Mark has 21 years of construction and engineering design experience. He has played a key role in the implementation of Autodesk BIM tools at Bernhard TME.Mark has shared his BIM knowledge at events such as Autodesk University, BIM Forum, ASHE, AHA, ASHRAE, FIATECH and numerous Revit User Groups.Mark got his start in the industry as a fire sprinkler designer. Mark has been leading the BIM Services Group at Bernhard TME. This group focuses on project delivery for the building lifecycle. Mark is also an adjunct Professor at Arizona State University and was involved with the development of the VLC Collaboration Space at Arizona State University and lectures on the subject of Building Startup and Commissioning using BIM tools.
Industry Talk / London 2019
How BIM Enhances Bridge Design Capabilities
SYSTRA expertise in bridge has started developing design capabilities for a High Speed Railway line and for an Elevated Metro line with the system integrated concept of the U-shape viaduct. We are now designing bridge structures for all types of transport modes including long-span bridges such as Chacao bridge in Chile, and road causeways such as The Sheikh Jaber Al Ahmad Causeway in the gulf of Kuwait. With the US-based company IBT, newly acquired in 2017, SYSTRA has reached in 2018 the 8th rank of the International ENR ranking for bridge engineering.This expertise is strategic to SYSTRA global capacity to deliver mass transit or rail infrastructure worldwide. That's why at the early stage of our BIM deployment we focused in developing internal solutions and design workflows that meet our clients needs and enhance our design efficiency and quality. This class will give you a global view of our internal BIM program for bridge by presenting our design solutions and project applications. The ambition of this program is to increase the efficiency of our engineers and the robustness of our design when creating the bridge assets and is aiming to provide to our client a digital twin of their infrastructure that is fitted for use during operation and maintenance. You will see how our bridge experts have embraced BIM in their design workflows from early stage to construction design using applications such as "BIM in One Click" for linear infrastructures or CABLOA for pre-stressing design.We will also share our feedback on 3D reinforcement design using Revit and its Sofistik plugin for rebar detailing and how to increase the efficiency using design automation. The end of the presentation will be dedicated to looking ahead, exchanging thoughts around application of AI or generative design to bridge, and sharing our initiatives on how to use BIM models for operation and maintenance purposes using our HYPERASSET solution.
1 - 20 of 411 results