AU Class
AU Class
class - AU

Connect Assemble to Oracle Primavera P6

Share this class
Search for keywords in videos, presentation slides and handouts:

    Description

    BIM has been playing an increasingly vital role in the evolution of the construction industry, there has been a demand to bring the same efficiencies to the scheduling phase of the project lifecycle. By combining the 3D model and project schedule, Assemble Systems and Oracle Construction and Engineering are working together to build a more accurate and reliable schedule. Join this session to learn how to use Assemble to combine and connect the baseline schedule and the BIM data.

    Key Learnings

    Tags

    Product
    Assemble Products
    Industries
    Civil / Site development contractors
    Architecture
    Topics
    Building Information Modeling (BIM)
    Virtual Design & Construction
    People who like this class also liked
    Harnessing the Power of BIM and Assemble
    Instructional Demo

    Harnessing the Power of BIM and Assemble

    Tracking Field Production with Assemble System and Power BI
    Instructional Demo

    Tracking Field Production with Assemble System and Power BI

    Never Miss a Beat: Track Everything with Assets and Equipment Management
    Instructional Demo

    Never Miss a Beat: Track Everything with Assets and Equipment Management

    Model Quality: The Biggest Efficiency Gain That You Are Not Using
    Panel

    Model Quality: The Biggest Efficiency Gain That You Are Not Using

    Data Models and Model Data Quality: Preparing for the Future of Design and Construction
    Panel

    Data Models and Model Data Quality: Preparing for the Future of Design and Construction

    Optimizing Assemble Using BIM 360
    Industry Talk

    Optimizing Assemble Using BIM 360