说明
BIM has been playing an increasingly vital role in the evolution of the construction industry, there has been a demand to bring the same efficiencies to the scheduling phase of the project lifecycle. By combining the 3D model and project schedule, Assemble Systems and Oracle Construction and Engineering are working together to build a more accurate and reliable schedule. Join this session to learn how to use Assemble to combine and connect the baseline schedule and the BIM data.
主要学习内容
标记
产品 | |
行业 | |
主题 |
喜欢这门课的人也喜欢
Instructional Demo
Harnessing the Power of BIM and Assemble
Instructional Demo
Estimating and Scheduling Integration: Automated 5D BIM Case Study
Industry Talk
Optimizing Assemble Using BIM 360
Instructional Demo