Labor Is the Biggest Number on Your Job. Why Is It the Last One You See?

We spent thirty years teaching the construction industry to stop working from stale information.

Nobody builds off a drawing set that is two weeks old anymore. Nobody walks a jobsite with a roll of paper under their arm hoping it matches what the design team issued on Tuesday.

We moved documents to the cloud. We moved models to the cloud. We connected issues to RFIs to cost, and we got very good at one specific idea: the information in front of you right now should reflect the project as it actually is right now.

That idea worked. Ask a superintendent when they last hand-checked every reference in a drawing set.

Then look at how the same company tracks labor.

The one number nobody keeps current

On a typical job, labor is the largest cost category a contractor manages, and in a FMI Labor Productivity Study, project examples showed labor running 42% to 52% of total cost. It’s also usually the last major cost category still reconstructed after the fact, tracked on spreadsheets and timesheets days or weeks after the work happened.

It is also, on most jobs, the only major cost category still reconstructed after the fact.

A foreman finishes the week, sits in a truck on Friday afternoon, and tries to remember what eight people did across four cost codes over five days. Some of it is right. Some of it is close. The parts that were unusual, like the two hours a crew spent on work that was clearly out of scope, are the parts most likely to be lost, because they were the hardest to remember and the least like everything else on the sheet.

That paper travels to the office. It gets keyed in. It reaches accounting. By the time job cost reports reflect the week, the week is three weeks gone.

Everyone in the business knows this. What is strange is how normal it feels. We would never accept a three-week lag on drawings. We accept it on the biggest number on the job without much comment, because the alternative has always seemed to require the one thing the field will never absorb: more paperwork.

The pressure is not letting up, either. In AGC of America's 2026 outlook, 82 percent of contractors reported difficulty filling hourly craft positions, the highest share in three years, and workforce shortages have become the leading cause of project delays. When crews are the constraint, knowing how crew hours are actually being spent stops being a back-office nicety.

Making the field current does not mean asking the field for more

This is the part that gets designed wrong most often.

The instinct is to solve a data problem by asking for more data. Add a second app. Add a form. Add a reporting step at the end of the day. The office gets what it needs and the field absorbs the cost, which is exactly the arrangement that produced the Friday afternoon truck cab in the first place. Adoption collapses, the data arrives incomplete, and the office quietly goes back to the spreadsheet.

The workable version runs the other way. You do not add a capture step. You replace the paperwork that already exists with one entry that produces all of the outputs.

A foreman opens a phone, pulls up the crew, allocates hours against cost codes that came down from the project's actual budget, and notes what got installed. That one entry becomes:

  • The timecard that flows to payroll and the ERP
  • The daily report the office and the GC are already asking for
  • The production record behind unit rates and earned value
  • The T&M ticket, with quantities, photos, and a signature attached, when the work is out of scope
  • The safety record, because the huddle and the JHA live in the same place, tied to the same crew on the same job

The foreman is doing less work than before, not more. That is the only version of this that survives contact with a real jobsite.

Two details matter more than they sound like they should. It has to work in Spanish, because a meaningful share of front-line leadership in this industry works in Spanish. And it has to work with no signal, because parking garages, mechanical rooms, and rural highway jobs do not care about your architecture. For crews who share equipment or leave phones in the truck, a shared kiosk on the job covers the rest.

What changes when labor is current

The obvious benefit is speed, but speed is not really the point. A current number is an actionable number. A stale number is a postmortem.

You find out while you can still do something about it. Production variance against budget shows up in period rather than at month end. A crew running behind on a cost code is a staffing decision on Wednesday. The same information a month later is a lesson learned.

Extra work reaches the invoice. T&M and change order work is where contractors quietly lose money, and usually not because anyone disputes that the work happened. Research from Clearstory and Dodge Construction Network found that 77 percent of specialty contractors have written off change order work as bad debt, that 83 percent say the change order process hurts their cash flow, and that the most common reasons GCs reject or reduce a claim are disputed pricing and insufficient backup documentation. The same research clocks the average trip from a signed T&M tag in the field to a priced change order request at 22 days, with another 26 days waiting on GC approval.

Captured at the moment it happens, with crew, hours, quantities, photos, and a signature attached, extra work stops being a negotiation and starts being a record. One project engineer at Champion Specialty described the before state plainly:

“Prior to Rhumbix we had $1M cost in T&M, only $600k invoiced, and no one could decipher what was in there.”

Project Engineer, Specialty Contractor

The office stops doing data entry. When field data arrives structured and cost-coded, payroll changes character. Payroll manager at Commercial Contracting Corporation, puts it at roughly 60 hours a week saved, and describes a department that "transformed from being a data entry department, to a quality control department." Customers at ArchKey report better than 90 percent improvement in payroll accuracy, and Turner reports cutting payroll processing time by 93 percent.

Foremen get their week back.

“Those hours saved add up. It's crazy. 40 hours a week just for foremen alone.”

Project Engineer, Specialty Contractor

That is time going back into running work.

Next year's bid gets better. Actual unit rates by crew and cost code, collected consistently across projects, are the closest thing this industry has to a feedback loop on estimating. Most contractors have never had them at that resolution.

The labor record holds up later. Multi-union classifications, shift differentials, per diem, and prevailing wage rules are configured into the point of capture, so the record is built as the work happens rather than reassembled during an audit. Certified payroll still runs in the ERP, where it belongs. What changes is the quality of what it has to work with. DPR runs more than 11,000 California clock-ins a month this way.

Connected to the rest of the project, not parked beside it

Field data that lives in its own system is a better version of the same problem. It has to move.

Rhumbix works in two ways with Autodesk Forma Build. Projects, budgets, and cost codes come down into the field app, so crews code against the office's structure instead of a parallel list somebody reconciles later. Actual labor cost, change management, forecasting, and documentation flow back up, including T&M tags that land in cost management and can be associated with potential change orders. Production tracking connects to Assemble and Navisworks, which is what turns installed quantities into progress against the model rather than a number in a spreadsheet.

And because plenty of contractors run their financials somewhere else, Rhumbix integrates with the construction ERPs already in place, including Sage 300 CRE, Viewpoint Vista and Spectrum, Foundation, COINS, and Penta.

The net effect is not a new dashboard. It is that the crew hour stops being an isolated fact and starts behaving like every other piece of project information: current, structured, and connected to the decisions it should be informing.

The last open loop

We made documents current. We made models current. We made cost and schedule current. The work itself, the people actually installing it, stayed on paper longer than anything else. It happens to be the most expensive part of the job.

Closing that loop does not require a new theory of construction. It requires giving front-line leaders a tool that costs them less time than the clipboard did, and then treating what they capture as first-class project data.

Save 20% when you add Rhumbix to Autodesk Construction Operations

Starting October 7, 2026, bundling Rhumbix with Autodesk Construction Operations gets you 20% off. If you're purchasing both together for the first time, you get 20% off Construction Ops. If you already have Construction Ops and are adding Rhumbix, you get 20% off Rhumbix.

The offer runs now through January 31, 2027.

Talk to your Autodesk account team to see what the offer looks like for your business, or visit rhumbix.com to see what your own labor data looks like when it is current.

Autodesk makes software and services available on a licensed or subscription basis. Rights to install, access, or otherwise use Autodesk software and services (including free software or services) are limited to license rights and services entitlements expressly granted by Autodesk in the applicable license or service agreement and are subject to acceptance of and compliance with all terms and conditions of that agreement. When you subscribe to a plan, it may renew automatically for a fixed fee on a monthly or annual basis, subject to availability. All benefits and purchase options may not be available for all software or services in all languages and/or geographies. Access to cloud services requires an Internet connection and is subject to any geographical restrictions set forth in the terms of use.

AUTODESK RESERVES THE RIGHT TO CANCEL, SUSPEND OR MODIFY PART OF, OR THIS ENTIRE PROMOTION, AT ANY TIME WITHOUT NOTICE, FOR ANY REASON IN ITS SOLE DISCRETION. PRICES FOR AUTODESK SOFTWARE ARE SUBJECT TO CHANGE. This offer is available for commercial copies only from Oct. 7, 2026 through Jan. 31, 2027, may not be combined with other rebates or promotions, and is void where prohibited or restricted by law. This offer cannot be combined with any conditions or discounts provided by Autodesk to contracted accounts, including but not limited to: accounts with enterprise business agreements, volume purchase agreements, or accounts purchasing extra territory rights. If applicable, this offer cannot be combined with the government customer discount program. The offer is only available through Autodesk.com or an Autodesk authorized reseller. Reseller prices may vary, more information on Autodesk resellers can be found at https://www.autodesk.com/partners/locate-a-reseller.

With this Rhumbix and Autodesk Construction Operations Bundle offer, customers save 20 percent instantly off the Autodesk global suggested retail price (SRP), excluding taxes.

Autodesk, the Autodesk logo, Rhumbix and Autodesk Construction Operations are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. ©2026 Autodesk, Inc. All rights reserved.

Key takeaways

  • Labor can be a contractor’s biggest cost, between 42–52%, but the last one tracked in real time, usually reconstructed later from spreadsheets and timesheets.
  • Adding a reporting step does not fix it. Replacing the paperwork that already exists with one field entry does.
  • Current labor data changes decisions inside the period: a crew running behind becomes a staffing call on Wednesday instead of a lesson learned at month end.
  • 77 percent of specialty contractors have written off change order work they could not collect, and 53 percent of rejections come down to insufficient backup documentation. Contemporaneous capture is that documentation.
  • Field data only pays off when it moves. Rhumbix works two ways with Autodesk Forma Build and connects to the construction ERPs contractors already run.