설명
BIM has been playing an increasingly vital role in the evolution of the construction industry, there has been a demand to bring the same efficiencies to the scheduling phase of the project lifecycle. By combining the 3D model and project schedule, Assemble Systems and Oracle Construction and Engineering are working together to build a more accurate and reliable schedule. Join this session to learn how to use Assemble to combine and connect the baseline schedule and the BIM data.
주요 학습
태그
제품 | |
산업 분야 | |
주제 |
이 수업을 좋아하는 사람들은 다음도 좋아했습니다.
Instructional Demo
Estimating and Scheduling Integration: Automated 5D BIM Case Study
Industry Talk
Optimizing Assemble Using BIM 360
Instructional Demo
Never Miss a Beat: Track Everything with Assets and Equipment Management
Instructional Demo