AU Class
AU Class
class - AU

Checking the Gut Check: Validating Project Schedules Using Lean Methods and Model-Based Planning

이 강의 공유하기
동영상, 발표 자료 및 배포 자료에서 키워드 검색:

    설명

    Contract schedules that are proposed during preconstruction can define the success or failure of project. Too often they are based upon a scheduler's gut check. Building Information Modeling (BIM), along with an integrated Lean workflow, is enabling schedulers to better predict flaws within the schedule and communicate expectations during construction. Currently, Autodesk and DPR Construction have teamed up to create an integration between Autodesk® Navisworks® software and the Last Planner® software, Ourplan, to visually track schedule commitments through the model on a three-week look-ahead. This integration enables DPR to track subcontractor tasks through the model while obtaining more validated input by visually communicating the scope of work expected and indicating potential roadblocks. We will present the current workflows while also proposing future needs for development to use quantity data to derive production rates for future projects, thus helping to take the guesswork out of critical preconstruction scheduling.

    주요 학습

    • Advocate for software development to support :Lean-model-based workflows
    • Describe the full lifecycle of a model from proposal to construction
    • Explain the value that model visualization of a schedule can have
    • Learn Lean workflows related to Last Planner scheduling

    태그

    제품
    Navisworks Manage
    산업 분야
    Civil / Site development contractors
    Site Development (General civil engineering)
    Architecture
    MEP engineering
    Structural engineering
    주제
    Teacher
    Production & Operations Manager
    Engineer
    Technology Manager
    IT Manager
    Marketing / Sales Manager
    Construction Manager
    Software Licensing & Deployment
    Automation, Integration, & Customization
    Building Information Modeling (BIM)
    Customization
    Buildings
    Software Development
    Virtual Design & Construction