AU Class
AU Class
class - AU

BIM and Asset Management—Workflows to Close the Circle

Compartir esta clase
Busque palabras clave en vídeos, diapositivas de presentación y materiales:

    Descripción

    This class will cover the importance of having an organized and standardized list of assets so the information can be manage at the maintenance and operations level, which is key in this process. It will also address the parameters that need to be consider for this effort, along with establishing responsibilities throughout the project development, such as who will be responsible for filling what and, most important, when this should happen (design, construction, and/or operations).

    Aprendizajes clave

    • Better understand the workflow of incorporating asset management information within a BIM model
    • Learn how to define the list of parameters and establish a workflow on how they are mapped to the different building objects/elements
    • Learn how to establish a criteria of who is responsible for getting the right information into the model so it can be used for FMO
    • Discover the electronic version of the close-out package documentation with the BIM model

    Etiquetas

    Producto
    Revit
    Sectores
    Architecture
    Temas
    Building Information Modeling (BIM)
    Facilities Management
    Design
    Building Operations
    Management
    CAD Management & IT
    Virtual Design & Construction
    A la gente que le gusta esta clase también gusta
    From Design to Digital Twin: Building Indoor GIS with CAD and BIM Data
    Instructional Demo

    From Design to Digital Twin: Building Indoor GIS with CAD and BIM Data

    Streamlining Asset Management and Progress Tracking with Forma Build and GAMMA AR
    Instructional Demo

    Streamlining Asset Management and Progress Tracking with Forma Build and GAMMA AR

    Fully Collaborative BIM to FM Workflow with Building Design Suite and BIM 360 Solutions
    Roundtable

    Fully Collaborative BIM to FM Workflow with Building Design Suite and BIM 360 Solutions

    A Transformational Journey on Rails: Better Outcomes for Passengers
    Industry Talk

    A Transformational Journey on Rails: Better Outcomes for Passengers

    How Location Amplifies the Value of Your BIM in Construction and Operation
    Panel

    How Location Amplifies the Value of Your BIM in Construction and Operation

    Harnessing the Power of Digital Twins in Facility Management
    Panel

    Harnessing the Power of Digital Twins in Facility Management

    Charlas de teatro relacionadas