AU Class
AU Class
class - AU

Forge Based Workface Planning for Oil and Gas Efficient Construction

Diesen Kurs teilen
Suchen Sie nach Stichwörtern in Videos, Präsentationsfolien und Handouts:

    Beschreibung

    One of the main obstacle that faces Workface Planning implementations, is the consolidation of information.In order to take the Construction needs in mind and to integrate 3D Models, Constraints, Material, Readiness, Progress in one portal accessible from any device Phone, Pad, PC. the market need a friendly platform like Autodesk Forge to answer the Direct construction supervision thirst for effective management of resources.

    Wichtige Erkenntnisse

    • Workface Planning
    • Advanced Work Packaging
    • Forge Development
    • 3D Model Integration

    Tags

    Produkt
    BIM 360
    Navisworks Manage
    Forge
    Branchen
    Civil / Site development contractors
    Site Development (General civil engineering)
    Energy and utilities owners and operators
    Architecture
    MEP engineering
    Structural engineering
    Oil and gas
    Product design and manufacturing
    Themen
    Drafting
    3D Modeling
    Building Information Modeling (BIM)
    Construction Management
    Data Management
    Isometrics
    Lean Construction
    Management
    Modular Construction
    Prefabrication