Asset 12 Asset 10 Asset 15 Asset 15 autodesk_icon_font_04_06_16_kl Asset 11 autodesk_icon_font_04_06_16_kl autodesk_icon_font_1_18_17_start_over-01

Worldwide Sites

You have been detected as being from . Where applicable, you can see country-specific product information, offers, and pricing.

Change country/language X

  • United States

    We have redirected you to an equivalent page on your local site where you can see local pricing and promotions and purchase online.

    Stay on our U.S. site

Keyboard ALT + g to toggle grid overlay

With help from Autodesk BIM for Infrastructure, Stantec gains deep competitive advantage

“We were tasked with infrastructure design, approvals, and coordination in support of the project’s parks, public spaces, and below- and above-grade facilities,” says Eric Smith, project manager at the Stantec New York office. One of the firm’s most important tasks was the creation of a 3D model illustrating the project’s existing and proposed below-grade facilities. To overcome challenges related to this task, Stantec felt it was important to use BIM—an intelligent 3D model–based process—and turned to Civil 3D and Navisworks Manage software for help creating the model, as well as improving collaboration and coordination.

The challenge

The Manhattanville project is tremendously complex, with numerous challenges, including a multidecade delivery schedule, widely varying site elevation, and a labyrinth of below-grade pedestrian hallways, mechanical spaces, and classrooms that require precise coordination. Although Stantec had used BIM on previous projects, the firm’s New York office had never used BIM on an infrastructure project, let alone one of this magnitude.

Columbia initially tasked Stantec with the design of two large infrastructure components, both of which had to be completed before other work could proceed. The first involved relocating a complex sewer system beyond the site’s limits. The second, now under construction, involved separating the University’s sanitary and storm systems. Once these projects were underway, Stantec also began design work for the grading, first-phase buildings, park entrances, public crossings, and esplanades. Deliverables included both 2D design documents and intelligent 3D models.

Complex regulator chamber created in Civil 3D Part Builder.


The solution

Stantec used AutoCAD software to create 2D design documents for the two initial infrastructure projects, as well as for the subsequent phase-one design effort. These 2D designs were then used as the basis for the Civil 3D model. “We also incorporated utility company record drawings, a standard survey, and a laser scan of most of the project’s perimeter,” says Smith. For help getting up to speed with Civil 3D and Navisworks, Stantec consulted Microsol Resources, an Autodesk Gold Partner and Authorized Reseller.

Civil 3D proved highly valuable as a modeling tool. “From an infrastructure point of view, almost nothing below-grade was standard,” says Tom Sergi, CAD manager at Stantec. “We had to build a whole library of parts for every single below-grade structure, including all pipes and conduits, chambers, and valves. That was quite a challenge.” Using the Parts Builder functionality in Civil 3D, Stantec created all necessary components and integrated them into the model. “The results were thoroughly impressive.”

Project team members used a variety of model-based solutions, including Revit Architecture, Revit MEP, and Revit Structure software. With help from Navisworks Manage, the team combined all the models into a single, integrated project model, which was useful to help visualize the entire project and for clash detection. “In the integrated 3D model, it is easier to discover areas that could have been problematic during construction,” says Sergi. “That helps us deliver a better-quality design, because we can more clearly see how everythingconnects before construction starts.”.

Overall project view including laser survey points.


“We’ve achieved our goals on the project so far,” says Smith. “But the model is a work in progress that will continue to grow until the end of the project.” Going forward, Stantec hopes to create a comprehensive parts database that will enable all team members to work from the same library and help accelerate project completion on future projects.

Before adopting Civil 3D, Stantec typically delivered 2D plans for these types of infrastructure projects. “Now we can show our clients the complexities of a project in three dimensions,” says Smith. The firm’s success on the Columbia Manhattanville project has attracted a number of inquiries from potential civil engineering clients. “People are starting to understand that BIM can really help with the spatial analysis of infrastructure projects. BIM and Civil 3D have definitely given us a competitive advantage. They are the future.”

View showing the complexities of sub grade utilities.


The result

“We’ve achieved our goals on the project so far,” says Smith. “But the model is a work in progress that will continue to grow until the end of the project.” Going forward, Stantec hopes to create a comprehensive parts database that will enable all team members to work from the same library and help accelerate project completion on future projects.

Before adopting AutoCAD Civil 3D, Stantec typically delivered 2D plans for these types of infrastructure projects. “Now we can show our clients the complexities of a project in three dimensions,” says Smith. The firm’s success on the Columbia Manhattanville project has attracted a number of inquiries from potential civil engineering clients. “People are starting to understand that BIM can really help with the spatial analysis of infrastructure projects. BIM and Civil 3D have definitely given us a competitive advantage. They are the future.”

Upcoming events

BILT ANZ 2017 (Adelaide, Australia)

WASHTO (Juneau, AK)

June 25 – June 28
http://www.washto2017.com/

Latest tweet

@AutodeskAEC

Gaining deep competitive advantage

BIM’s enhanced spatial analysis capability helped Stantec gain a competitive edge.